Construction

Connolly-Pacific is a full-service marine contractor, committed to safe operations and to completing your projects on time and on budget. Call us today to see how we can help you, or review our project profiles below.

Project Profiles

    San Pedro Emergency Breakwater Repairs

    Owner: USACE
    Date(s): September 2014 - March 2015
    Project scope: Furnish and install 33,100 tons A-12 armor stone.

    Mission Bay Jetty Breakwater Repair

    Owner: USACE
    Date(s): October 2009 - May 2010
    Project scope: Recovery-San Diego River & Mission Bay Middle Jetty repair.

    Port of San Luis Breakwater Repairs

    Owner: USACE
    Date(s): August 2005 - March 2006
    Project scope: Furnish & place 2,500 tons of stone for breakwater repair.

    Berth 78 Brigantine Berthing

    Owner: Port of Los Angeles
    Date(s): July - October 2004
    Project scope: Drive piles and build floating dock for brigantine ships berthing.

    Ventura South Beach Groin Repair

    Owner: USACOE
    Date(s): July - October 2003
    Project scope: Rebuilt the existing Groin, placed 19,000 tons of stones.

    Port of Long Beach Middle Harbor Terminal Redevelopment

    Owner: Port of Long Beach
    Date(s): November 2012 - July 2015
    Project scope: Pier E terminal redevelopment, Slip 1 fill and berth D28 demolition.

    Port of Long Beach Middle Harbor Terminal Redevelopment

    Owner: Port of Long Beach
    Date(s): April 2011 - May 2014
    Project scope: Wharf & backlands redevelopment, Phase 1, Stage 1 @ Piers D, E & F, Berths D28-D30, E11-E27 & F1-F6.

    Port of Long Beach Middle Harbor Terminal Redevelopment

    Owner: Port of Long Beach
    Date(s): March 2013 - January 2014
    Project scope: Dredge support.

    Port of Long Beach Middle Harbor Terminal Redevelopment

    Owner: Port of Long Beach
    Date(s): January 2012 - November 2013
    Project scope: Dike & landfill construction Wharf & Backlands Redevelopment, Phase 1, Stage 2 @ Pier E, Berths E25-E27.

    Port of Los Angeles Channel Deepening

    Owner: USACOE
    Date(s): September 2002 - September 2013
    Project scope: Dike and landfill construction.

    Rip-rap Repair at Marine Stadium

    Owner: City of Long Beach
    Date(s): January 2014
    Project scope: Furnish and install 150 tons rip-rap stone.

    LA Waterfront - Downtown Harbor Water Cut

    Owner: Port of Los Angeles
    Date(s): June 2013
    Project scope: Furnish and replace 2,000 tons of 3" rock.

    Berth 102 Slope Repair

    Owner: Port of Los Angeles
    Date(s): April 2011
    Project scope: Furnish & place 482 tons of A-250 armor stone at Berth 102 to repair slope.

    SCE - Revetment Repair - Catalina

    Owner: SCE
    Date(s): November 2008
    Project scope: Rip-rap slope repair.     

    Bolsa Chica Lowlands Restoration Project (Huntington Beach)

    Owner: U.S. Fish & Wildlife Service
    Date(s): March - September 2005
    Project scope: Furnish 200,000 MT of stone.

    SCE - North Wheeler Kelp Reef Construction

    Owner: SCE
    Date(s): January - September 2008
    Project scope: Placed 125,000 tons of 2" dia. rocks in multiple locations.

    Bird Island (ARCO PRC-421) (Goleta)

    Owner: BP/ARCO Fairweather Pacific LLC
    Date(s): Ocotber - November 2005
    Project scope: Furnish & place 4,500 tons of armor stone for artificial reef.

    PRC-421 Pier Remnant Removal & Bird Roost Installation Project

    Owner: BP/Arco
    Date(s): October - November 2005
    Project scope: Subcontract with Fairweather Pacific LLC to supply and place (underwater) roughly 4,500 tons of Armor Stone. CP also converted flat barge CP44 into a temporary derrick barge for charter to Divecon Services, LP in connection with their work on this project.

    San Elijo Ocean Outfall Reballast Project (San Elijo)

    Owner: San Elijo Joint Powers Authority
    Date(s): September - Ocotber 2005
    Project scope: Furnish 47,000 tons of ballast stone.

    Orange County Outfall Repair

    Owner: Orange County Sanitation District
    Date(s): July - October 2002
    Project scope: $4.9 million contract to place 60,000 tons of reballast stone in 60 feet of water, misc outfall repairs.

    Fireboat Station 15 Dock Upgrade at Pier F - Berth 202

    Owner: POLB
    Date(s): September 2014 - Present
    Project scope:

    White's Landing Pier Replacement

    Owner: Catalina Island Conservancy
    Date(s): June 2015 - Present
    Project scope: Replace storm damaged pier.

    CRC 2015 T&M

    Owner:
    Date(s): June - July 2015
    Project scope: Pier G fender repair.

    Berth 42-43 Fender Pile Repair

    Owner: LG Everist
    Date(s): April - June 2015
    Project scope: Install new piling.

    Tuna Club Foundation Repair

    Owner: Catalina Island Tuna Club
    Date(s): January - May 2015
    Project scope: Repair damaged foundation piles, repair float.

    Cabrillo Way Marina

    Owner: Port of Los Angeles
    Date(s): April 2009 - November 2010
    Project scope: Furnish & place 118,400 tons QR & 11,400 tons armor stone per POLA Spec. #2712,

    Dock 9 Construction - Rainbow Harbor

    Owner: City of Long Beach
    Date(s): June - October 2007
    Project scope: Replace wooden dock with concrete system.

    Downtown & Shoreline Marinas Rehabilitation Project at Long Beach Marina

    Owner: City of Long Beach
    Date(s): January 2005 - March 2007
    Project scope: Design/build 1,700 new marina boat slips. Replace dock system with concrete floats, F & I new piles, F & I  new utilities.

    Bayshore Marina (Newport Beach)

    Owner: The Irvine Company
    Date(s): October 1998 - February 1999
    Project scope: Replace dock system.

    Portofino Cove Marina Replacement

    Owner: Portofino Cove Yacht Owners Association
    Date(s): October 1996 - May 1997
    Project scope: Reconstruct a floating dock system using both new and salvaged materials.